Things are moving quickly with our build, with crisp autumnal mornings greeting the team now.

This week the team has been laying down the hi span reinforcing metal sheeting. This is riveted together and supported underneath. The in-slab heating team will be laying its piping later today and into early next week.

A lot of debate went into the heating system, but we’ve gone with heat pumps which will heat hot water to circulate through the concrete floor slab. We were after a slow release heat that is continuously on, rather than having to heat up certain rooms from scratch.

However exposed concrete was not the finished look that we wanted, so we are having carpet and timber over the concrete slab. The heat will still penetrate both surfaces.

The concrete slab should be poured on Tuesday with frames arriving mid week.

 

 

 

Any questions, please ask away. If you were wanting to secure a section and undergo your own build please get in touch.

Mitch

 

 

 

 

 

 

 

 

 

TAGS
RELATED POSTS
MITCH CAMPBELL

mitch campbell

Welcome to my property hub, a place designed to showcase the very best of premium property in Central Otago and provide you with everything you need to ensure that your journey of buying or selling in this beautiful region is as smooth as possible.

I wanted to create a platform to share insights and knowledge on everything property-based from the Wanaka region, but also feature outstanding design products, interviews with industry locals, interesting architectural work and new trends to help inspire you with your own plans.

If you're looking at either buying or selling in the Wanaka region, please get in touch and let me help you achieve those goals.

Email mitch.campbell@raywhite.com
Phone number: 021 2424 280